Open Tenderocds-kuma6s-170502

Replacment and Installation of New Chiller Unit to Sherman Theatre Air Handling System

Sherman Theatre is looking for a suitably qualified contractor to replace a failed chiller unit, situated in the theatre’s roof compound and forming a core part of the building’s Air Handling System. Included as part of the tender is: • the decommissioning, removal and disposal of the existing unit • siting of new unit (piping to the existing cooling pipework in the building, supplying Air Handling Unit one and two, and connecting / commissioning). • Provision of BMS engineer to test the operation of the cooling sy...

Buyer

Sherman Theatre

Value

Not provided

Published

18 Sept 2026

Closes

19 Oct 2026

Procurement details

Source

Sell2Wales

Region

United Kingdom

Procurement method

OPEN

Category

Goods

Contract starts

Not provided

Contract ends

Not provided

CPV classifications

42000000

Industrial machinery

42500000

Cooling and ventilation equipment

50000000

Repair and maintenance services

50700000

Repair and maintenance services of building installations

51000000

Installation services (except software)

51100000

Installation services of electrical and mechanical equipment

51500000

Installation services of machinery and equipment

Lots

Replacment and Installation of New Chiller Unit to Sherman Theatre Air Handling System

Lot default

Value not provided

Sherman Theatre is looking for a suitably qualified contractor to replace a failed chiller unit, situated in the theatre’s roof compound and forming a core part of the building’s Air Handling System. Included as part of the tender is: • the decommissioning, removal and disposal of the existing unit • siting of new unit (piping to the existing cooling pipewor...

Document metadata

Replacment and Installation of New Chiller Unit to Sherman Theatre Air Handling System

tenderNotice · text/html